▶ Dundas Street (BRT)
"Over the next 35 to 40 years the number of people who live, work, learn and travel along the Dundas Street corridor will increase. To manage this growth, the City of Mississauga is developing a long-term, future-oriented Master Plan focusing on transit, land-use, and public space." -- Dundas Connects webpage (2018)
Dundas Connects Master Plan - Corridor Vision Approved

June 2018: The final DRAFT of the Dundas Connects Master Plan was approved at the Planning & Development Committee (PDC) of Mississauga Council (June 11, 2018 Agenda - 303p PDF).
See: Dundas Connects webpage, and 2018 Master Plan (197p PDF).
Since then ...

Left: Concept image (Source: Figure 5-58: Complete street demonstration perspective, in the final Dundas Connects Master Plan, 2018). Cycling infrastructure is a big part of the plan. The entire Dundas Corridor was proposed to have a Cycle Track / Separated Bike Lane.
▶ Topical MCN! X Posts:
SEEING GREEN: Interim design for Downtown #Cooksville section of #DundasBRT. GC Presentation (Nov 15 '23) 🔗: https://t.co/nmudysuGJa (12-slide PDF). #Cycling is integral to Dundas BRT 🚍🚏corridor with 2.0m protected uni-directional #CycleTracks (both sides). #bikeMississauga 🚲 https://t.co/yPpjCRkrzx
— Mississauga Cycling Now! (@MissCyclingNow) November 17, 2023
CYCLING NETWORK NEEDED, STAT! 🏢🏗 1535 Dundas St E proposes #BikeParking 🅿️ for 954 bicycles (1,433 units - may need to up ratio). Developers know bike-friendly projects are attractive to buyers; City needs to catch up t/b attractive to (and keep) residents. #bikeMississauga 🚲 https://t.co/6Zvcuv7Uth pic.twitter.com/vxOJv7gSvz
— Mississauga Cycling Now! (@MissCyclingNow) August 23, 2023
DUNDAS BRT: RFPQ issued for 7km East Mississauga section 🔗⤵️ #Cycling is integral to #DundasBRT 🚍🚏 corridor design: "Boulevard space [includes] a 2.0m protected cycle track. Where constrained, sidewalk & #CycleTracks w/b replaced with a multi-use path..." #bikeMississauga 🚲 https://t.co/lDI3UmXjzF
— Mississauga Cycling Now! (@MissCyclingNow) February 21, 2023
DUNDAS STREET CORRIDOR: *TONIGHT* Mon May 30 @ 6pm at PDC Item 6.7 - livestream 💻 Draft Dundas Corridor OPA to implement the #DundasConnects vision incl "providing safe #cycling infra along the [entire] length..." Documents 📄🔗: https://t.co/Y6gp9Z73aG | #bikeMississauga 🚲 pic.twitter.com/0lNBx0xceq
— Mississauga Cycling Now! (@MissCyclingNow) May 30, 2022
Copyright © 2025 MCN! - Mississauga Cycling Now! All Rights Reserved.